Today Maurizio and I made sure that the fake boxes in the
new configuration (LED ORed in with attico laser in box 97 (hardware
channel 58) worked for all supermodules, by flashing both the LEDs
and the attico lasers. (The lower laser fake box has been left
entirely alone, so it should work the same as before). It all seems OK.
Today Maurizio did laser calib runs for microvax 3, for attico and
lower SM's. Next week LED calibrations will probably resume.
Kate.