This is a quick update on the gain reset operation that was completed
on Friday, December 18, 1998.
The first full MACRO RUN following gain reset is # 16834 of 18-DEC-1998.
The gain reset operation span over 10 days of which though gains were
adjusted only during 7 of them. Acquisition was always kept running
in 2/3 of the detector minimum with PHRASE and ERP. The weekend in between
the gain reset operation had the full detector on.
There were a total of 9 tank end operations that are now done. The counters
will be reinserted in acquisition next week. With the exception of these
few counters, threshold setting for PHRASE and ERP is now complete throughout
the whole detector.
I'd like to thank everybody (Massimo O., Nicola Z., Valleriano M.,
Fabrizio C., Ioannis K.) who contributed in this operation.
Regards,
--Erik