About run 17428

ORSINI MASSIMO (Massimo.Orsini@lngs.infn.it)
Fri, 9 Apr 1999 14:12:02 +0200

Hi everybody,

notice that during run 17428 that started today at 8.15 (solar time), the
Lecroy power supply on SM3 failed and all trigger rates related to the whole
SM3 were seriously affected by this damage which caused a loss of part of the
default operating voltages.
For this reason the run was stopped after 25 minutes and a new acquisition
(run 17429) was started by Nicola without uVax2 in order to fix the LeCroy.
From run 17430, uVax2 was succesfully put back in acquisition.

A presto,

Massimo