Diagnosis of DD039


Subject: Diagnosis of DD039
Nicola.Zaccheo@lngs.infn.it
Date: Wed Feb 16 2000 - 09:36:51 EST


This is a report on the processing of DD039

From: AXPGS3::MACROUSA "LNGS US MACRO group" 15-FEB-2000 10:11:21.54
Subj: Start COPY of FIRST (#1) file of DD039 (RUN011967)
From: AXPGS3::MACROUSA "LNGS US MACRO group" 15-FEB-2000 17:29:01.59
Subj: Done COPY of LAST (#37) file of DD039 (RUN011997)

Download from tape to disk lasted ~ 7 hrs because of problems with one of
juke-box disk. We relaunched the copy job 3 times.

From: AXPGS4::MACROUSA "LNGS US MACRO group" 15-FEB-2000 17:29:07.39
Subj: Submitted FIRST (#1) ZEB2RAW job of DD039 (RUN011967)
From: AXPGS4::MACROUSA "LNGS US MACRO group" 15-FEB-2000 19:42:03.57
Subj: Submitted LAST (#37) ZEB2RAW job of DD039 (RUN011997)

Conversion of ZEBRA to RAW lasted ~ 2.2 hrs

For the following run there were two versions of LGB files (with different
sizes). Erik changed the error message so that we have now how many times
the job finds the same run in LGB files list.

  SIZE RUN90164 DD039 RAW FOUND 2 TIMES;RAW REF 0 ACT 2828 ZEB ACT 4852
  R-A -2828 TOL 150-NO
  EB2RAW LOG ERRORS RUN90164 DD039 SIZE= 0-OK NO-ZEB-DELETE

This run was a calibration run (LED/TDC) flagged as "normal" run (WE NEED
TO CHANGE THE RUN TYPE ON LGB) with a bad LGB entry.

Then the processing of the RAW RUN files started. It lasted ~ 10 hrs

The job identified the following calibration runs. All of them do exist
in the expected area disk$scrausa10:[macrodata.raw.cal]

        CALIB: DD039 RUN090163 CAL1 (HIST)/1 (STAT)
        CALIB: DD039 RUN090164 CAL1 (HIST)/1 (STAT)
        CALIB: DD039 RUN090165 CAL1 (HIST)/1 (STAT)
        CALIB: DD039 RUN090166 CAL1 (HIST)/1 (STAT)
        CALIB: DD039 RUN090168 CAL1 (HIST)/1 (STAT)
        CALIB: DD039 RUN090169 CAL0 (HIST)/1 (STAT)

The first 5 runs were identified as CALIBRATION ones. History file
was in agreement with the statistics file. Run 90164 is flagged as "normal"
run (see previous comment).
Last run was not in the calibration history file. I verified that it is a
calibration run and I updated the disk$macro:[macrocal.docs]cal_run_list.txt
 

DD039 is now completed. It took 7+2.2+10= ~19.2 hrs.



This archive was generated by hypermail 2a24 : Wed Feb 16 2000 - 09:36:53 EST