Ioannis and I are planning a short, simple GC LED test today. For
this test, we will be firing boxes one by one on both supermodules of
uvax 2. This time, (unlike earlier tests) we will be logging which
boxes have LED pulses, so that efficiency checks will be possible.
Ioannis estimates that we can achieve a rate of about 30 Hz (we will
see how fast it goes). If all goes well, there will one run with a
few such bursts.
The current plan is:
-- At about 2 pm, we will turn off the regular run, and start normal
acquisition (vxmaca) for PHRASE on mvax 1 and 3.
-- After a few mini-acq tests of the new switchbox/pulser code, we
will start a run on the backup acquisition with PHRASE and ERP. Note
that this data will not be seen by the PHRASE monitor software, but it
will be logged. The ERP monitor software will look at the data,
however.
-- We will perform a short run with several LED bursts separated by
intervals of a few minutes.
Kate.