(Last) Run Coordinator's Meeting, 17 July 1995

LONGLEY@lngs.infn.it
Mon, 17 Jul 1995 20:47:21 +0200 (WET-DST)

Minutes of the Run Coordinator's Meeting
17 July 1995

Present: Longley (Reporting), Goretti, Miller, Fantini, Margiotta

There was no streamer tube technician at the meeting again this week.

The scintillator CAMAC branches will be reconfigured to make room for the
attico TOHM this week.

Erik K. has changed the SMT paramters to lower the trigger rate. There is
little change in acceptance (details from Erik later).

EQUIP 32 (Scintillator Pattern Init) has been moved in front of EQUIP 42 (WFD)
to keep it out of the ID=2 buffers which are forced by long WFD events.

By decree of the Run Coordinator, future Formal Run Coordinator's Meetings
have been cancelled due to lack of interest and because the minutes are
duplicated in the shift reports. Run Coordinator-type stuff will take place
on an informal basis (as it was before) until further notice.

(There was general rejoicing.)