Subject: About the ENEL power line failure
From: ORSINI MASSIMO (Massimo.Orsini@lngs.infn.it)
Date: Fri Jun 16 2000 - 05:18:33 EDT
HI guys,
yesterday the ENEL power lines failed in the tunnel around 17:30 because
of a terrible rain storm (as Torelli declared).
We went in the tunnel with the italian shiftworker (Patera) at 18:00 in
order to turn MACRO back on and we had to stay there till 20:45.
Notice that the italian shiftworker car was leaving us in the tunnel
because the engine temperature reached the 100C and we risked in going
in the laboratory on feet.
After having started a new run (19644), we had to fill the car engine
with four bottles of water to get out from that nightmare......
A presto,
Massimo
This archive was generated by hypermail 2a24 : Fri Jun 16 2000 - 05:38:51 EDT